Home
Diagnostic Manual, Body and Accessories,
Volume 1.1

 Printable version
LOCATION:    3.5 Models 129, 140, 170   Pneumatic System Equipment (PSE) >   22 Electrical Test Program - Preparation for Test


Electrical Test Program - Preparation for Test

Preparation for Test:
1. Insert module specific module into HHT
2. Battery voltage 11 - 14 V,
3. Fuses ok,
5. Connect socket box with test cable according to connection diagram, see 22, Figures 1, 2 and 3 accordingly, for model being tested.
6. Review section 0, 11, 12, 20, 21, 22, 31, 32
,Electrical Wiring Diagrams:
See Electric Troubleshooting Manual, Model 129, Volume 2, group 80,
Model 140, Volume 2, group 80,
Model 170, Volume 2, group 80

Test equipment; See MBUSA Standard Service Equipment Program

Description Brand, model, etc.
Digital multimeter Fluke models 23, 77 III, 83, 85, 87

Connections - PSE control module





Figure 4

1 Connector 1 (control line PSE)
2 Connector 2 (voltage supply PSE)
3 Connector 3 (control line ATA)
4 Connector 4 (load connections ATA)