Diagnostic Manual, Body and Accessories,
Volume 2.1
Pneumatic Test Program - Preparation for Test
Preliminary work:
23
|
Data (mbar)
Test procedure |
Permissible deviation |
Permissible leakage from the entire system at >2 bar pressure in 1 minute. |
Max. 100 mbar |
Preparation for Test:
1. Provide access to closing assist supply pump (M14/3).
2. Assemble test lines according to connection diagram (
33, Figures).
3. Connect test lines and pressure gauge according to connection diagram
( 33, Figure 1 or 2).
Note:
If one or more pneumatic circuits of the CA supply pump are switched off
by the safety feature (incorrect pressure buildup times), the pump can be
reset by briefly interrupting circuit 30. This can be done by removing fuse
F4-9 in rear fuse box F4 for approx. 5 seconds, or by disconnecting the
connector from the CA supply pump (M14/3).
Note:
Any suitable pressure gauge which reads in bar (range 1 to 5 bar)
can also be used.
|
Conventional tools, test equipment
Description |
Brand, model, etc. |
Engine analyzer 1) |
Bear DACE (Model 40-960)
Sun MEA-1500MB |
1) Available through the
MBUSA Standard Equipment Program. |
Parts Required for Test
Part No. |
Description |
Quantity |
Item no. ( 33,
Figures 1 and 2) |
007 997 61 82 |
Rubber hose |
6 meters |
3 |
129 800 09 15 |
Line |
1 |
2 |
126 800 00 78 |
Check valve |
1 |
6 |
129 805 04 44 |
Pneumatic connector |
1 |
1 |
000 987 11 45 |
Cap |
1 |
5 |
117 078 01 45 |
Junction connector |
1 |
20 |
140 800 51 81 |
Line |
1 |
21 |
|