STI Home
Diagnostic Manual, Body and Accessories,
Volume 6

 Printable version
LOCATION:    19.1 Roll Bar (RB) (Crash Deployment)   >   23 Electrical Test Program - Test


Electrical Test Program - Test

Test scope
Test connection
Test condition Nominal value Possible cause/Remedy
1.0 RB control module (N53)
Erase DTC .
Read other DTC's in memory
DTC erased

RB control module (N53)


2.0 RB control module (N53)
Voltage supply, circuit 15


9
N53



11
Ignition: ON 11 - 14 V Wiring,
Ignition switch (S2/1)
3.0 RB deployment solenoid (Y57/1)
Voltage supply


X23
2
Ignition: OFF
Disconnect RB solenoid valve connector (X23).
11 - 14 V Wiring,
3.1
3.1 RB deployment solenoid (Y57/1) with wiring
Resistance
N53

1



F24
4
Disconnect auxiliary fuse holder (F24). 0.5 - 1.5 RB deployment solenoid (Y57/1),
Wiring,
3.2
3.2 RB deployment solenoid (Y57/1) with wiring
Insulation resistance


9
N53



1
Disconnect connector from RB control module (N53).
Disconnect auxiliary fuse holder (F24).
> 20 k Wiring,
3.3
3.3 Insulation resistance
Circuit 30

X23
2


N53

1
Disconnect RB solenoid valve connector (X23) > 20 k Wiring.
4.0 Rear axle switch (S83/2 or S83/3)
Resistance


15
N53



16
Switch S83/2 and S83/3 in position:
Function
S83/2 in: Arretiert
S83/3 in: Arretiert


< 2
> 20 k
> 20 k
Wiring
Rear axle switch (S83/2 or S83/3),
4.1
4.1 Insulation resistance
Circuit 31


9
N53



15
Disconnect connector from RB control module (N53).
Switch S83/2 and S83/3 in position: Function
> 20 k Wiring,
4.2
4.2 Insulation resistance
Circuit 30


15
N53



11
Disconnect connector from RB control module (N53).
Switch S83/2 and S83/3 in position: Function
> 20 k Wiring.
5.0 RB malfunction indicator lamp (E30)


2
N53



7
Bridge sockets 2 & 7.
Ignition: ON


Disconnect connector from RB control module (N53).
Disconnect bridge.

Indicator lamp ccomes on.


Indicaator lamp goes out.
RB malfunction indicator lamp (E30),
Wiring,
5.1
5.1 Diagnostic cable
Insulation resistance


2
N53



7
Disconnect indicator laamp (E30). > 20 k Wiring.