Diagnostic Manual, Body and Accessories,
Volume 1.1
Electrical Test Program - Preparation for Test
Preparation for Test:
1. Fuses for PSE system and PSE control module ok,
2. Battery voltage 11 - 14 V,
3. Provide acess to PSE control module (A37),
4. Provide access to combination control module (N10-1 or N10-3),
5. Connect socket box with test cable according to connection diagram, see
22, Figure 1 - 3.
Electrical Wiring Diagrams:
See Electric Troubleshooting Manual, Model 170, (please see future ETM),
Model 210, Volume 2, group 80 |
Conventional tools, test equipment
Description |
Brand, model, etc. |
Multimeter 1) |
Fluke models 23, 83, 85, 87 |
1) Available through the
MBUSA Standard Equipment Program. |
|