Home
Diagnostic Manual, Body and Accessories,
Volume 1.1

 Printable version
LOCATION:    3.4 Models 202, 208, 210   Pneumatic System Equipment (PSE) >   22 Electrical Test Program - Preparation for Test


Electrical Test Program - Preparation for Test

Preparation for Test:
1. Voltage supply to all control modules and CAN data lines ok,
2. Battery voltage 11 - 14 V,
3. Review section 0,
4. Review C/1, C/2, 11, 12, 20, 21, 22, 31, 32
5. Connect HHT, see section 0,
6. For model 202 and 208, review PE80.00-P-1100D and for model 210 review PE80.00-P-1100A, prior to starting test.

Electrical Wiring Diagrams:
See Electric Troubleshooting Manual, Model 202/208, group 80,
Model 210, Volume 2, group 80

Test equipment; See MBUSA Standard Service Equipment Program

Description Brand, model, etc.
Digital multimeter Fluke models 23, 77 III, 83, 85, 87

Connections - PSE control
module (A37)

 





Figure 4

1 Connector 1 (control line PSE)
2 Connector 2 (voltage supply PSE)
3 Connector 3 (control line ATA)
4 Connector 4 (load connections ATA)