Diagnostic Manual, Body and Accessories,
Volume 4.1
Electrical Test Program - Preparation for Test
Preparation for Test:
1. Fuses ok,
2. Battery voltage 11 - 14 V,
3. RCL and CL systems ok,
4. Provide access to PSE control module (A37),
5. Provide access to combination control module (N10-1),
6. Connect socket box with test cable according to connection diagram,
see 22, Figure 1.
Electrical Wiring Diagrams:
See Electric Troubleshooting Manual, Model 210, Volume 2, group 82
|
Conventional tools, test equipment
Description |
Brand, model, etc. |
Multimeter 1) |
Fluke models 23, 83, 85, 87 |
1) Available through the
MBUSA Standard Equipment Program. |
|