Home
Diagnostic Manual, Body and Accessories,
Volume 1.1

 Printable version
LOCATION:    3.1 Model 140  Pneumatic System Equipment (PSE) >   32 Pneumatic Test Program - PSE Control Module Test


Pneumatic Test Program - PSE Control Module Test

Preparation for Test:
1. Connect reservoir with vacuum Y-distributor to vacuum/pressure tester.
2. Provide access to PSE control module (A37, A37/1) and disconnect PSE pneumatic multiple connector (do not disconnect electrical wiring harness).
3. Connect vacuum/pressure tester with reservoir to PSE control module (A37, A37/1).

Notes:
1. Before testing the safety switch time of the consumers, as well as between the tests for P+ (pressure) and P- (vacuum), interrupt the PSE control module power supply for at least 3 seconds.
2. After testing of the PSE control module, disconnect the power for approx. 3 seconds (to erase DTC memory and safety memory).
3. After completing the PSE control module test, do not operate any system which would require vacuum or pressure supply for approx.
10 minutes.


Preliminary work:
Diagnosis - Diagnostic Trouble Code (DTC) Memory 11

Preparation for Test:
1. Check fuse F2-5, F4-3 and fuse F4-11.
2. Battery voltage 11 - 14 V.
3. Provide access to PSE control module (A37, A37/1).
4 Disconnect pneumatic multiple connector from PSE control module (A37, A37/1).

Parts Required for Test:
1 Reservoir 107 800 08 19
1 Vacuum Y-distributor 017 078 01 45
5 Cap 000 987 29 45

Test step Test scope Test connection Test condition Nominal value Possible cause/Remedy
1.0 Central locking system
Vacuum supply
PSE control module connector ZV to black connector on tester. Cap connections on the PSE control module:
Bosch: P-, P+, SFG, FKS, RH
Hella: Pu, Pü, SFG, FKS, RFH
Lock central locking system.
450 mbar in 1.1 sec. 23 1.0,
23 PSE/CL 1.0 - 4.0
PSE control module (SMS, Repair Instructions, Job No. 80-270).
2.0 Central locking system
Pressure supply
PSE control module connector ZV to yellow connector on tester. Cap connections on the PSE control module:
Bosch: P-, P+, SFG, FKS, RH
Hella: Pu, Pü, SFG, FKS, RFH
Unlock central
locking system.
450 mbar in 0.7 sec. 23 1.0,
23 PSE/CL 1.0 - 4.0
PSE control module (SMS, Repair Instructions, Job No. 80-270).
3.0 Backup assist
Pressure supply
PSE control module connector RH to yellow connector on tester. Cap connections on the PSE control module:
Bosch: P-, P+, ZV, SFG, FKS
Hella: Pu, Pü, ZV, SFG, FKS
Ignition: ON
Engage reverse gear.
Pump runs
after approx.
0.3 sec. delay.
450 mbar in 0.7 sec.
23 1.0,
23 PSE/BA 1.0,
PSE control module (SMS, Repair Instructions, Job No. 80-270).
4.0 Backup assist
Vacuum supply
PSE control module connector RH to black connector on tester. Cap connections on the PSE control module:
Bosch: P-, P+, ZV, SFG, FKS
Hella: Pu,, ZV, SFG, FKS
Ignition: ON
After at least 10 seconds, move selector lever out of reverse gear.
Pump runs
after approx.
10 sec. delay.
450 mbar in 1.1 sec.
23 1.0,
23 PSE/BA 1.0,
PSE control module (SMS, Repair Instructions, Job No. 80-270).
5.0 Retractable trunk lid grip
Pressure supply
PSE control module connector SFG to yellow connector
on tester.
Cap connections on the PSE control module:
Bosch: P-, ZV, RH, FKS
Hella: Pu, ZV, RFH, FKS
Unlock central
locking system.
Open trunk lid.
450 mbar in 0.7 sec. 23 1.0,
23 PSE/RTG 1.0,
PSE control module (SMS, Repair Instructions, Job No. 80-270).
6.0 Retractable trunk lid grip
Vacuum supply
PSE control module connector SFG to black connector on tester. Cap connections on the PSE control module:
Bosch: P-, ZV, RH, FKS
Hella: Pu, ZV, RFH, FKS
Close trunk lid.
Pump runs
after approx.
0.5 sec. delay.
450 mbar in 1.1 sec.
23 1.0,
23 PSE/RTG 1.0,
PSE control module (SMS, Repair Instructions, Job No. 80-270).
7.0 Orthopedic seat backrest
(lumbar support or multi-contour backrest)
Pressure supply
PSE control module connector P+ to yellow connector on tester. Cap connections on the PSE control module:
Bosch: P-, SFG, FKS, RH
Hella: Pu, SFG, FKS, RFH
Switch ignition off, then on.
Pump runs
after approx.
4 sec. delay.
450 mbar in 0.7 sec.
23 1.0,
PSE control module (SMS, Repair Instructions, Job No. 80-270).
8.0 Head restraint retraction
Vacuum supply
PSE control module connector FKS to black connector on tester. Cap connections on the PSE control module:
Bosch: P-, P+, ZV, RH, SFG
Hella: Pu,, ZV, RFH, SFG
Rear head restraints raised
Ignition: ON
Activate the rear head restraint retraction switch.
450 mbar in 1.1 sec.
23 1.0,
23 PSE/RTG 1.0,
PSE control module (SMS, Repair Instructions, Job No. 80-270).
9.0 Intake manifold vacuum assist
Vacuum supply
PSE control module connector P- to black connector on tester. Cap connections on the PSE control module:
Bosch: P+, ZV, SFG, FKS, RH
Hella: , ZV, SFG, FKS, RFH
Switch ignition off, then on.
Pump runs
after approx.
8 sec. delay.
450 mbar in 1.1 sec.
23 1.0,
PSE control module (SMS, Repair Instructions, Job No. 80-270).
10.0 Control of the REST function
Vacuum supply
PSE control module connector P- to black connector on tester. Ignition: OFF
Engine coolant temperature >50° C.
Cap the transparent PSE line at the PSE control module junction connector.
Push on N22/1
Pump runs at 450 mbar in 1.1 seconds. 23 1.0, 7.0
PSE control module (SMS, Repair Instructions, Job No. 80-270).
11.0 Central locking system
Safety switch time
- Cap connections on the PSE control module:
Bosch: P-, P+, SFG, FKS, RH
Hella: Pu,, SFG, FKS, RFH
Lock or unlock the central locking system.
PSE control module runs approx.
10±1 sec.
23 1.0,
PSE control module (SMS, Repair Instructions, Job No. 80-270).
12.0 Additional consumers P-
Safety switch time
- Cap connections on the PSE control module:
Bosch: P+, RH
Hella: Pü, RFH
Switch ignition off, then on.
PSE control module runs approx.60 sec.
23 1.0,
PSE control module (SMS, Repair Instructions, Job No. 80-270).
13.0 Additional consumers P+
Safety switch time
- Cap connections on the PSE control module:
Bosch: P-, RH
Hella: Pu, RFH
Switch ignition off, then on.
PSE control module runs approx.60 sec.
23 1.0,
PSE control module (SMS, Repair Instructions, Job No. 80-270).